Empire Tower Sathorn Project
1997-1998 was the largest building in the country. The total area of 72,000 square meters CURTAIN WALL is the company's first job. Receive a total of 30 million baht in labor costs for the assembly and installation.
In this work, one contractor came to receive the labor cost for the assembly, installation, floor 11,12,13 and asked to increase the labor cost from 282 baht / square meter to 800 baht / square meter. Non-negotiable The boss of MD then asked to find a contractor to do it.
Therefore, Khun Somboon (MD) established SC Scaling Company Limited to continue with the rest. The building is designed to withstand earthquakes, with every corner of the building being 3 columns together. There is a CURTAIN WALL panel test at YORK, PENSILVANIA USA. The building corner is also tested.
For the first time, Khun Somboon (MD) was a PROJECT MANAGER for KASION FC Co., Ltd. by helping to design work in Hong Kong for 2 months, after ordering materials to be assembled at TEMMESSY and put the boards to test at YORK, PENSILVANIA USA.
After that, the economy is not good. Also accept installation of SHOW ROOM and other 10 floors of EMPIRE TOWER building in the amount of 10 million baht / floor